Chapter 2 - Strata Ct Installation; Inspection; Packaging And Storage - Toshiba strata CT Installation & Maintenance Manual

Digital business telephone system
Hide thumbs Also See for strata CT:
Table of Contents

Advertisement

Strata CT Installation

Inspection

H

Packaging and Storage

C
Strata CT I&M Manual October 2000
This chapter explains how to install the Strata CT system. It includes information on site
requirements and provides installation instructions for various cabinet configurations. It also
explains how to install earth wiring, AC power cabling, reserve power (Battery Backup)
cabling, and Printed Circuit Board (PCB) cabling.
When the system is received, examine all packages carefully and note any visible damage. If
any damage is found, do not open the packages. Contact the delivery carrier immediately and
make the proper claims.
After unpacking (and before installing), check the system against the packing list and inspect
all equipment for damage. If equipment is missing or damaged, contact your supplier
immediately.
Be sure to retain original packaging materials for re-use when storing or transporting system
hardware.
CAUTION!
When handling (installing, removing, examining) PCBs, do not touch the
back (soldered) side or edge connector. Always hold the PCB by its edges
and wear anti-static wrist bands.
When packaging and storing the system, remove PCBs from the system cabinet (the power
supply may remain installed in the cabinet for storage and shipment). PCBs should be
packaged in their original antistatic bags for protection against electrostatic discharge. Be
sure to package equipment in its original shipping containers.
Strata CT Installation
2
2-1

Advertisement

Table of Contents
loading

Table of Contents