Special Instructions of Wiring Wiring of front cover
2. Wiring on inside of front cover
Insert the connector of the LED lead wire into
the connector of the SS-VR PCB assy.
3. Wiring of SS-VR lead wire and operation lead wire
40mm
Operation
PCB assy.
LED lead wire
Pass the LED lead wire to front
of the SS-VR PCB assy.
40mm
Operation lead wire
SS-VR PCB assy.
SS-VR PCB assy.
SS-VR lead wire
Secure the lead wires
with a band.
7 - 13