Appendix
A.5 Acceptance Log
A.5.2 Function test of the acceptance test
Description
The function test must be carried-out separately for each individual drive
(assuming that the machine permits this to be done).
Executing the test
First commissioning
Series commissioning
A-10
Please mark
Operating Instructions, 11/2006, A5E00766042B AA
Control Units CU240S