Upload a parameter set with an MMC
Prerequisites
To perform a series commissioning with the MMC the following conditions must be fullfiled:
● Supply voltage is active for the upload inverter
● The upload inverter is in "Ready State".
Parameter
Description (Parameter name and factory setting (if not variable) in bold)
Insert the MMC to the inverter - for the parameter set to be uploaded, perform the following
steps:
P0010 = 30
Commissioning parameter*
0: Ready
1: Quick commissioning
2: Inverter
30: Factory setting, parameter transfer
95: Safety commissioning (for CUs with fail-safe functions only)
P0804 = ?
Select Clone file
0: clone00.bin
...
99: clone99.bin
Note: Via P0804 the name of the clone file can be selected. Theoretically up to 100 (0 ... 99)
parameter sets can be stored on an MMC.
P0802 = 2
Transfer data from EEPROM
0: Disabled
1: Start OP Transfer
2: Start MMC Transfer
If the upload has been completed successfully, P0010 and P0802 will be set to 0 and the
"RDY" LED is on.
If the upload has failed, F0061 (MMC-PS not fitted) will be displayed, LED "SF" (red) is on.
In this case insert an MMC and attempt another upload.
After a successful upload remove the MMC from the upload inverter.
Control Units CU240S
Operating Instructions, 11/2006, A5E00766042B AA
Note
Before uploading, the parameters will be copied from RAM to EEPROM
Commissioning (software)
5.7 Commissioning modes
Setting
5-53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu240sCu240s dpCu240s dp-f

Table of Contents