Sirona Dental Systems GmbH
Operating Instructions CEREC MC XL
61 46 885 D 3439
D 3439.201.02.11.02 10.2009
Switching the unit off
✔ The unit has finished the machining operation.
➢ Briefly press the ON/OFF button on the front panel.
When you let go of the button, the unit switches off.
5.5
Repacking
CAUTION
Repack only drained units!
Drain the unit! See chapter on "Removing water from the unit". [ 46]
✔ The water tank is empty.
✔ The main switch on the back side of the unit is set to the 0 (OFF) position.
1.
Disconnect the power cable and the connecting cable from the back side
of the unit and stow them away.
2.
Stow away the calibration tools in the drawer.
3.
Check the unit for completeness according to the scope of supply!
4.
Pack the unit securely.
5.6
Scope of supply
The exact scope of supply is specified in the document "ChecklistCEREC MC
XL".
5.7
Storage
CAUTION
Only drained units may be stored!
Drain the unit! See chapter on "Removing water from the unit". [ 46]
Store the unit in a closed and dry room at a temperature of -10°C to 50°C for
a maximum period of 12 months.
5 Installation and startup
Repacking
23