MCK pbxgateway Administrator's Manual page 61

Hide thumbs Also See for pbxgateway:
Table of Contents

Advertisement

PBXgateway Installation
Before you Power-Up the PBXgateway
Introduction
This procedure will detail the necessary steps to perform
BEFORE bringing the units online.
Checklist
The units are secured to a rack or placed on a shelf
"
within the rack.
The appropriate 50-pin female, RJ-21 connectors are
"
connected to the Telephony Interface and wired to the
PBX (PBXgateway) and remote user phones (Remote
unit).
At least one WAN port is connected to the appropriate
"
network-terminating device.
or
The LAN port is connected to your network using a
"
standard RJ-45 Ethernet cable.
Note: Required only if you plan to manage or connect to
the Remote units via an IP network.
Power Up
If the above checklist is OK, plug the power cord into an
AC outlet.
Power-Up
The WAN (PWR, 1, 2) and the Port Status LEDs (1-12)
Sequence
will begin to flash. The unit automatically runs through a
series of self-tests. After the tests are complete, all active
WAN port LEDS and connected phone ports should be lit
solid "Green".
Note: If the LEDs do not light as described above, see
Chapter 6-Troubleshooting.
Issue 2.1 December 1999
3-18

Advertisement

Table of Contents
loading

Table of Contents