Muratec MFX-2500 Field Engineering Manual page 273

Hide thumbs Also See for MFX-2500:
Table of Contents

Advertisement

10.Remove two screws and the Fusing Rear Guide Assy.
11.Remove two pressure springs.
12.Snap off one E-ring and remove the front Misfeed Clearing Lever Assy and bearing.
13.Remove the Fusing Right Roller.
14.Snap off two retaining rings.
15.Remove one gear and two bushings.
16.Remove the Fusing Left Roller.
Note: When the Fusing Left Roller is removed, it can cause the spring to come off the Separator
Finger. After the Fusing Left Roller has later been reinstalled, be sure to hook the spring onto the
Separator Finger.
5-16

Advertisement

Table of Contents
loading

Table of Contents