Nortel Web OS Switch Software Application Manual page 459

Switch software
Table of Contents

Advertisement

11.
Assign the BWM contracts to different switch ports.
Physical switch ports are used to classify which frames are managed by each contract—that is,
one BWM contract will be applied to all frames from a specific port. The second contract will
be applied to all frames from another specified port.
>> BWM Contract 2# /cfg/port 1/cont 1
>> Port 1# ../port 2/cont 2
12.
On the switch, apply and verify the configuration.
>> Port 2# apply
>> Port 2# /cfg/bwm/cur
Examine the resulting information. If any settings are incorrect, make any appropriate changes.
13.
On the switch, save your new configuration changes.
>> Bandwidth Management# save
14.
On the switch, check the BWM information.
>> Bandwidth Management# /info/bwm <contract number> (View BWM information)
Check that all BWM contract parameters are set correctly. If necessary, make any appropriate
configuration changes and then check the information again.
212777-A, February 2002
Web OS 10.0 Application Guide
(Assign contract 1 to port 1)
(Assign contract 2 to port 2)
(Make your changes active)
(View current BWM settings)
(Save for restore after reboot)
Chapter 17: Bandwidth Management
n
459

Advertisement

Table of Contents
loading

This manual is also suitable for:

Web os 10.0

Table of Contents