Nortel Meridian 1 Option 11C Upgrade Manual page 68

Hide thumbs Also See for Meridian 1 Option 11C:
Table of Contents

Advertisement

Page 68 of 224
Upgrade a two-cabinet system with metal cable to Option 11C
553-3021-250
Standard 7.00
Procedure 5
Upgrade to fiber-optic connection
1
Log in and perform a data dump on the existing system.
You must do this step to make sure you back up any changes made
after the last data dump.
a
Load Overlay program 43 (LD 43).
b
Enter command EDD.
c
Wait until the data dump finishes.
2
Disconnect the power from the main and expansion cabinets.
Set the circuit breaker switch on the front of the power supply unit in
each cabinet to OFF.
If equipped with reserve battery power, set the circuit breaker switch
inside the reserve battery power units to OFF.
3
Disconnect and remove the NTAK1204 or NTAK1205 cable from
both cabinets (see Figure 24 on page 68).
Figure 24
NTAK1204 or NTAK1205 cable connection
4
Remove the ground connection from the ground lug in the main
cabinet.
April 2000
NTAK1204 or NTAK1205 cable

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1 11c mini

Table of Contents