Nortel Meridian 1 Option 11C Upgrade Manual page 103

Hide thumbs Also See for Meridian 1 Option 11C:
Table of Contents

Advertisement

Upgrade an Option 11E with fiber-optic cable to Option 11C
Figure 42
Door hinge opening
30
Install a fiber routing guide in each expansion cabinet under slot
0 (Fbr Rx), as shown in Figure 43 on page 107.
31
Connect all the cables that you labeled and disconnected from
the old cabinets in Step 26 on page 102.
Note: The connectors in the main and expansion cabinets for cables
going to the cross-connect terminal have numbers J1 to J10 (instead
of J11 to J20 in the old expansion cabinets).
When upgrading a system with two expansion cabinets (three-cabinet
system) make sure of the following:
— If you use a single port expansion daughterboard, connect
existing expansion cabinet 1 to the daughterboard in connector
"Fiber 1" and cabinet 2 to the daughterboard in connector "Fiber
2." Make sure you have labeled and connected the cables, as
shown in Table 3.
— If you use two dual port expansion daughterboards, connect
the first expansion cabinet 1 to the top connection on the
daughterboard in connector "Fiber 1." Connect cabinet 2 to the top
connection on the daughterboard in connector "Fiber 2." Make
sure you have labeled and connected the cables from the
expansion cabinets as shown in Table 3 on page 104
— If you use one dual port expansion daughterboard, connect
the first expansion cabinet 1 to the top connection on the
daughterboard in connector "Fiber 1." Connect cabinet 2 (the
existing expansion cabinet) to the bottom connection on the
Option 11C and 11C Mini
Page 103 of 224
Upgrade Procedures Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1 11c mini

Table of Contents