Fujitsu M10-4 Service Manual page 385

Hide thumbs Also See for M10-4:
Table of Contents

Advertisement

Table 23-1     Types of maintenance for operation panel
Configuration
Building block configuration Unsupported
*1: If any physical partition is currently operating, the crossbar box cannot be powered off.
*2: All the physical partitions must be powered off, and the system must be completely shut down.
23.2.2
Maintenance flow
Table 23-2
Table 23-2     Maintenance flow
Details of update process
1
2
3
4
23.2.3
Precautions for replacement
Note the following point when replacing the operation panel:
If you replace the operation panel, set the BB-ID for the new operation panel to the
same value as that prior to the start of maintenance.
23.3
Enabling the Removal of the Operation
Panel
This section describes the preparations that must be completed prior to removing the
operation panel.
Caution - To completely shut down the system, all the power cords must be
removed. If the power cords are not removed, an electrical failure may occur.
1.
Open the rack door.
2.
Log in to the XSCF shell.
Active/hot
Active/cold
Unsupported
(*1)
lists the sequence of the maintenance procedure for the operation panel.
Preparation
Removing the operation panel
Installing the operation panel
Restoring the system
Chapter 23 Maintaining the Operation Panel of the Crossbar Box
Inactive/hot
Inactive/cold
Unsupported
Unsupported
(*1)
System stopped
Supported (*2)
Replacement
23.3
23.4
23.5
23.6
361

Advertisement

Table of Contents
loading

This manual is also suitable for:

M10-4sSparc m10-4Sparc m10-4s

Table of Contents