Pre-Operation Tasks; Power On - Graco ProMix PD2K Operation

Dual fluid panel, electric proportioner for automatic spray applications
Hide thumbs Also See for ProMix PD2K:
Table of Contents

Advertisement

Pre - - - Operation
Operation Tasks
Pre
Pre
Operation
Pre
Pre - - - operation
Pre
operation Checklist
operation
Checklist
Checklist
Go through the Pre-Operation Checklist daily, before
each use.
Checklist
✔ ✔ ✔
Checklist
Checklist
System grounded
System
System
Verify all grounding connections
were made. See Grounding
Installation manual.
All
All connections
All
connections tight
connections
Verify all electrical, fluid, air, and
system connections are tight and
installed according to the Installation
manual.
Fluid
Fluid
Fluid supply
supply containers
supply
Check component A and B and
solvent supply containers.
Dose valves
valves set
Dose
Dose
valves
Check that dose valves are set
1–1/4 turns open. Start with
the settings recommended in
Valve Settings, page
as needed.
Fluid
Fluid
Fluid supply
supply valves
supply
pressure
pressure set
pressure
The recommended component A and
B fluid supply pressures are 1/2 to 2/3
of the target spray pressure.
NOTE: Low pressure systems may
NOTE:
NOTE:
be set within a range of ± 100 psi (0.7
MPa, 7 bar); high pressure systems
may be set within a range of ± 300 psi
(2.1 MPa, 21 bar). If the inlet pressure
is higher than the outlet pressure,
ratio accuracy may be affected.
Solenoid pressure
Solenoid
Solenoid
85-100 psi inlet air supply (0.6-0.7
MPa, 6-7 bar).
3A4486D
Tasks
Tasks
grounded
grounded
Grounding
Grounding in the
tight and
tight
and correct
and
correct
correct
containers
containers filled
filled
filled
set
set
18, then adjust
valves open
valves
open and
open
and
and
set
set
pressure set
set
pressure
set

Power On

Power
Power
On
On
1. Turn the AC Power Switch (P) ON (I = ON,
0 = OFF).
2. The Graco logo will display while the system
initializes, followed by the Home screen.
3. Press the Start key
Power pop-up screen.
The softkey options allow for powering a specific
Mix Unit, or both at the same time. The system
status will change from "System Off" to "Startup."
Once the pumps are powered and are in the
Home position, the system status will change
from "Startup" to "Standby."
Figure 9 Power Switch

Pre-Operation Tasks

to display the Pump
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Promix pdPromix pd1kAc1002Ac3002Ac2002Ac4002

Table of Contents