Uncrating The System; Overview; Installation Overview; Operation Overview - Graco UniDrum C59784 Instructions And Parts List

Supply system
Table of Contents

Advertisement

Uncrating the System

Uncrating the System
The UniDrum Supply System was carefully packaged
for shipment by Graco. When the system arrives,
perform the following procedure to uncrate the system.
NOTICE
Moving the unit off of the pallet without following the
uncrating procedure can damage the equipment.
To uncrate the system, perform the following steps:
1. Inspect the crate carefully for shipping damage.
Contact the carrier promptly if damage is
discovered.
2. Remove the plywood sides and top of the crate.
3. Inspect the contents carefully. There should not be
any loose or damaged parts.
4. Compare the packing slip against all items included
in the crate. Report any shortages or other
inspection problems immediately.
5. Remove the band straps that hold the UniDrum to
the pallet.
6. The UniDrum is ready for installation. Before
installing the system, read the General Description
section on page 13 to become familiar with the
system components.
8

Overview

Installation Overview

The location of the UniDrum should allow for easy
loading and unloading of the 300 gallon (1200 liter)
magnadrum or other tote drums with a forklift.
The UniDrum Supply System must be leveled and
mounted on a horizontal floor. An unleveled condition
can keep the UniDrum from operating properly.
Anchor the frame's four foot pads securely to the floor.
The anchor bolts should be sized with sufficient safety
factor to withstand the downward force of the follower
plate and other objects that can push the frame off the
floor.

Operation Overview

The UniDrum is a supply system that evacuates fluids
from a 300 gallon (1200 liter) magnadrum or other tote
drums.
Each UniDrum includes two Graco air motors and
displacement pumps, a ram assembly with a follower
plate, and a pneumatic layout panel that controls the air
components.
In short, the operator places the magnadrum inside the
frame with the follower plate placed directly on top of
the material. Locally, the system can be operated using
the pneumatic layout panel.
Two displacement pumps evacuate material out of
each magnadrum. After removing the empty drum from
the system, the operator repeats the evacuation
process when another drum is ready for evacuation.
309169ZAF

Advertisement

Table of Contents
loading

Table of Contents