The Multi Bypass Unit must be installed on the
LCIT before the LCIT is docked to the mainframe.
If the LCIT is already installed, it must be
disconnected from the mainframe before
installation of the Multi Bypass Unit.
Slide 114
Installation is different from previous models.
Bypass Tray
114
BR-C1 Training