Site Locations; Station Circuit Distribution From Equipment Room - Avaya S8700 Installing

With avaya mcc1 or scc1 media gateways
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Installing the Avaya™ S8700 Media Server with Avaya™ MCC1 or SCC1 Media Gateway
The 300-pair 110P-type terminal blocks that can be used are:
110PE1-300CT/FT
blue field
110PE1-300FT
The 900-pair 110P-type terminal blocks that can be used are:
110PE1-900CT/FT
blue field
110PE1-900FT

Site Locations

Site locations are closets that provide a point in the station wiring for the administration of
remote powering. Adapters are used at site locations to terminate the 25-pair station cables and
provide connection points (modular jacks) for power adapters and 4-pair station cables.
The 258A and BR2580A adapters plug into a 25-pair female cable connector. These adapters
divide the 25-pair cable into six 4-pair (modular jack) circuits. See
Adapters'' on page
159.
The 356A adapter plugs into a 25-pair female cable connector. See
159. The 356A adapter divides the 25-pair cable into eight 3-pair circuits. Although the circuits
are 3-pair, the adapters modular jacks will accept the 8-wide modular plug used on the 4-pair
station cable.
!
CAUTION:
Adapters wired similarly to the 356A should not be used. Their jacks do not accept 4-pair
plugs.

Station Circuit Distribution from Equipment Room

This section explains the station circuit distribution from the equipment room to the information
outlets for new wiring installations. Example connection diagrams are provided to show the
options for running and connecting the station cables.
If most of the telephones/voice terminals that require remote powering are within 250 ft
(76.2 m) of the equipment room, 4-pair station circuits are run from the equipment room to the
information outlets. If this is not the case, or if the customer requires 2-point administration,
3-pair station circuits are run from the equipment room to satellite locations. Then, the 4-pair
station circuits are run from the satellite locations to the information outlets.
This section has information about
''4-Pair Station Circuits'' on page 154
''3-Pair to 4-Pair Station Circuit Distribution'' on page 154
''Connected cable station adapters'' on page 158
25-pair connector on the white field and field-terminated on the
Field-terminated on both the white and blue fields
25-pair connector on the white field and field-terminated on the
Field-terminated on both the white and blue fields
May 2003
Connect the MDF to Stations and PSTN
''258A and BR2580A
''356A Adapter'' on page
153

Advertisement

Table of Contents
loading

Table of Contents