Complete The Scbe2-Mx Upgrade - Juniper MX240 Hardware Manual

Universal routing platform.
Hide thumbs Also See for MX240:
Table of Contents

Advertisement

NOTE:
After a power supply is powered on, it can take up to 60 seconds for status
indicators—such as the status LEDs on the power supply and the show chassis command
display—to indicate that the power supply is functioning normally. Ignore error indicators
that appear during the first 60 seconds.
If any of the status LEDs indicates that the power supply is not functioning normally, repeat the
installation and cabling procedures.
9. On the external management device connected to the Routing Engine, monitor the startup process to
verify that the system has booted properly.
NOTE:
If the system is completely powered off when you power on the power supply,
the Routing Engine boots as the power supply completes its startup sequence. Normally,
the router boots from the Junos OS on the CompactFlash card.
After turning on a power supply, wait at least 60 seconds before turning it off.

Complete the SCBE2-MX Upgrade

1. Verify that the installation is successful and the SCBE2-MX is online:
user@host> show chassis environment cb 0
CB 0 status
State
Online
Temperature 30 degrees C / 86 degrees F
...
user@host> show chassis environment cb 1
CB 1 status
State
Online
Temperature 30 degrees C / 86 degrees F
...
Other details, such as, temperature, power, etc are also displayed along with the state.
2. Verify that the fabric planes come online correctly:
418

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents