3. Press the "Start test" softkey.
A list of all of the activities required for the test are shown to the right in the detailed display.
Figure 5-7
4. Press the "Collect data" softkey.
Then follow the instructions on the screen (e.g. activate the forced checking procedure of
the switch-off signal paths).
Safety Integrated
Function Manual, 10/2015, 6FC5397-3EP40-5BA3
First test: Switch-off signal path setting area
Commissioning - acceptance tests
5.3 Sequence of an acceptance test
127