Commissioning - acceptance tests
5.2 Content of the complete acceptance test
Note
If the results of function test, Part 2 are taken from another identical machine, then this is the
sole responsibility of the machine manufacturer and must be appropriately commented in the
acceptance report.
118
Function Manual, 10/2015, 6FC5397-3EP40-5BA3
Safety Integrated