Engine Installation - Honda CX650C 1983 Shop Manual

Table of Contents

Advertisement

BOND-
@
CX650C
ENGINE REMOVALIINSTALLATION
Remove the engine front mounting bolts.
Disengage the drive shaft from the universal joint
assembly by adjusting the jack height and moving
the engine forward.
Remove the engine from the frame.
wire harnesses and cables.
p
-
-
ENGINE INSTAkATION
The installation sequence is essentially the reverse
of removal.
Place the transmission into gear.
Lubricate the final shaft splines with lithium-based
multipurpose grease NLGl No.
2
(MoS2 additive).
Raise the engine with a jack and align the drive shaft
with the universal joint.
Slide the drive shaft into the universal joint assemb-
ly by moving the engine backward. Make sure that
the final drive splines are exposed 5-6 mm from the
end of the universal joint.
NOTE
s
Align the mounting surfaces carefully to
prevent damage to mounting bolt threads,
wire harnesses and cables.
e
Route the wires and cables properly (Page
1-10, 'l
l ) .
FRONT MOUNTING BOLTS
UNIVERSAL JOINT
45-70 N.m
60-80 N.m
(4.5-7.0 kcl-m, 33-51 ft-lb)
(6.0-8.0 kg-m, 43-58 ft-lb)
Tighten the engine mount bolts, to the correct
torque values.
- -
with the recommended oil
and coolant.
e
Perform the following inspections and ad-
justments:
Clutch free play (Page 3-14).
Engine oil level (Page 2-2).
Radiator coolant (Pap 3-10).
Engine oil and coolant leakage.
p - . . - . . - - . . . . - - p
I
60- 80 N.m
45-70 M.m
(6.0-8.0
kg-m,
43-58 ft-lb)
(4.5-7.0 kg-m,
33-51
ft-lb)
Date of
Issue:
December,
1982
O
HONDA MOTOR
CO.,
1.PD.

Advertisement

Table of Contents
loading

Table of Contents