3.1 Introduction
This chapter provides information for powering up the system and verifying system operation,
system configuration and setup, booting and installing the operating system, and updating
firmware.
3.2 Powering Up the System
Power up the system by pressing the On/Off power button on the operator control panel (see
Figure 3-1). Testing begins, and status messages are displayed on the console terminal screen
and on the OCP display.
Errors encountered during power-up are displayed on the operator control panel. For
information about error messages on the operator control panel, see Chapter 6.
Figure 3-1 Operator Control Panel
1
c
Display
Power button
Power LED (green)
2
3
4
5
Reset button
Halt LED (amber)
Halt button
Compaq ES40CSLP Rackmount System Installation/User/Service Guide 3–1
6
LJ-06608
3
Operation