Figure 221: Connecting Power To The Three-Phase Wye Ac Power Supply - Juniper T640 Hardware Manual

Core router
Hide thumbs Also See for T640:
Table of Contents

Advertisement

T640 Core Router Hardware Guide
414
Connect the AC power cord wires to ground and the AC terminal block on the
14.
three-phase wye AC power supply
terminals or grounding point screws, insert each wire into the grounding point or input
terminal, and tighten the screw.
NOTE:
The terminal connections have either slotted screws or hex screws.
Use a 1/4-in. slotted screwdriver for the slotted screws. Use a 5/32-in
(4-mm) Allen wrench for the 5/16-in hex screws.
Insert the wire labeled
a.
Insert the wire
L1
into the
b.
Insert the wire labeled
c.
Insert the wire labeled
d.
Insert the wire labeled
e.
Figure 221: Connecting Power to the Three–Phase Wye AC Power Supply
Verify that the power cord wire connections are correct.
15.
Using a number 2 Phillips (+) screwdriver, tighten the two captive screws on the metal
16.
AC wiring compartment.
Place the AC power cord into the plastic tie located on the right side of the power
17.
supply, and fasten the plastic tie.
Verify that the AC power cord is not touching or blocking access to router components,
18.
and that it does not drape where people could trip on it.
Remove the ESD grounding strap from the ESD points on the chassis. Connect the
19.
strap to an approved site ESD grounding point. See the instructions for your site.
(Figure 221 on page
GND
into the grounding point labeled
L1
input terminal.
L2
into the
L2
input terminal.
L3
into the
L3
input terminal.
N
into the
N
input terminal
L1
L2 L3
N
414). Loosen each of the input
GND
.
Copyright © 2017, Juniper Networks, Inc.

Advertisement

Table of Contents
loading