IBM Flex System p260 Installation And Service Manual page 106

Hide thumbs Also See for Flex System p260:
Table of Contents

Advertisement

1. Go to http://www.ibm.com/support/entry/portal/Overview to download the latest firmware for
the compute node.
Download the firmware so that you can use it later to update the compute node after you start it.
2. Read the Safety topic and the "Installation guidelines" on page 35.
3. If you have not done so already, install any optional devices that you want, such as a SAS drive or
memory modules.
4. Select the bay for the compute node:
v See http://publib.boulder.ibm.com/infocenter/flexsys/information/topic/
com.ibm.acc.common.nav.doc/chassis.html that comes with your IBM Flex System Enterprise
Chassis to verify that the bay you choose is powered.
v Ensure proper cooling, performance, and system reliability by installing a compute node,
expansion unit, or slot filler in each bay.
v Reinstall a compute node in the same bay to preserve configuration information and update
options that are established by the bay. Reinstalling into a different bay can have unintended
consequences, which might include reconfiguring the compute node.
5. Verify that the release handles on the compute node are in the open position (perpendicular to the
compute node, as shown in Figure 44 on page 93). For the IBM Flex System p260 Compute Node,
there is one release handle. For the IBM Flex System p460 Compute Node, there are two release
handles.
6. Remove any existing compute node and filler nodes from the bay in which you plan to install the
compute node.
Note: If you are installing a IBM Flex System p460 Compute Node, you might need to remove a
shelf from the chassis. See http://publib.boulder.ibm.com/infocenter/flexsys/information/topic/
com.ibm.acc.8721.doc/removing_the_chassis_shelves.html.
7. Slide the compute node into the bay from which you removed it until the compute node stops.
8. Push the release handles on the front of the compute node to close and lock them.
The discovery and initialization process can take up to 3 minutes to complete. The discovery and
initialization process is complete when the green LED stops flashing rapidly and begins to flash
slowly. At this point, you can power on the compute node.
9. Turn on the compute node. See "Turning on the compute node" on page 12.
10. Verify that the power-on LED on the compute node control panel is lit continuously. The continuous
light indicates that the compute node is receiving power and is turned on.
11. Optional: Write identifying information on one of the user labels that come with the compute node
and place the label on the IBM Flex System Enterprise Chassis bezel.
Important: Do not place the label on the compute node or in any way block the ventilation holes on
the compute node. See the online information or the documentation that comes with your IBM Flex
System Enterprise Chassis for information about label placement.
12. Use the SMS Utility program to configure the compute node. See "Using the SMS utility" on page
24.
13. Also use the management module to configure the compute node. See the documentation for the
management module to understand the functions that the management module provides.
94
Power Systems: IBM Flex System p260 and p460 Compute Nodes Installation and Service Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Flex system p460

Table of Contents