●
When establishing a wireless link between the GCS and the X100
●
When arming the X100
●
Continuously during flight
1
Monitor the MPBat field:
When establishing a wireless
connection
When arming the X100
During flight
19.4 Flight plan
19.4.1
Create a project
P
REREQUISITES
●
GCS with Quickfield software installed
●
Internet connection when defining project location online
●
GPS position
Creating a project is typically done in the office.
1
Open Quickfield and click New Project on the opening screen.
2.0
Prepare for flight
Flight plan
Battery voltage
Time
must be above
12.0 V
12.0 V
10.2 V
9.6 V
— 151 —
If not
Replace the battery with a fully
charged one.
Handle a low battery warning
before launch
Handle a low battery warning
(10.2 V) during flight
Handle a low battery warning (9.6
V) during flight
12 October 2012