Toshiba TOSVERT VF-MB1 Instruction Manual page 244

Industrial inverter for 3-phase induction motors
Hide thumbs Also See for TOSVERT VF-MB1:
Table of Contents

Advertisement

Connection example when using the computer link function
<Independent communication>
6
Perform computer-inverter connection as follows to send operation frequency commands from the host
computer to inverter No. 3:
Host computer
INV
INV
Given
Given
No.00
No.01
away
away
"Given away": Only the inverter with the selected inverter number conducts data processing. All other
inverters, even if they have received the data, give it away and stand by to receive the
next data.
* : Use the terminal board to branch the cable.
(1)
Data is sent from the host computer.
(2)
Data from the computer is received at each inverter and the inverter numbers are checked.
(3)
The command is decoded and processed only by the inverter with the selected inverter number.
(4)
The selected inverter responds by sending the processing results, together with its own inverter
number, to the host computer.
(5)
As a result, only the selected inverter starts operating in accordance with the operation frequency
command by communicating independently.
INV
INV
Given
No.02
No.03
away
F-124
E6581697
: Wiring
(Host  INV)
: Data
: Response data (INV  Host)
INV
Given
No.29
No.30
away
INV
Given
away

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents