Develop ineo 250 Service Manual Field page 121

Hide thumbs Also See for ineo 250:
Table of Contents

Advertisement

7. Other
[5]
[7]
[12]
[11]
82
<Rear>
4. Position the round bead [5] of the
[6]
NOTE
• Make sure that the bead snugly
4040F2C718DA
5. Wind Scanner Drive Cable 3 [7]
NOTE
• Make sure that no part of the cable
4040F2C719DA
6. Wind Scanner Drive Cable 4 [8] four
[8]
NOTE
• Make sure that no part of the cable
4040F2C720DA
[10]
7. Install two pulleys (front and rear) [9]
8. Attach two bushings [10] to the shaft.
[9]
4040F2C721DA
9. Secure the front and rear pulleys [11]
[12]
[11]
4040F2C722DA
Field Service Ver. 1.0 Aug. 2005
Scanner Drive Cable in the slit [6] in
the pulley.
rests in the slit in the pulley.
around the pulley four turns counter-
clockwise, from the rear toward the
front side.
rides on the other.
turns clockwise from the rear to the
front side. Then, secure the cable
with tape.
rides on the other.
to the shaft.
using one screw each [12].

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ineo 250 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ineo 350

Table of Contents

Save PDF