Preparing The Cable Plate For Service - Sun Microsystems SPARC Enterprise T5120 Installation And Service Manual

External i/o expansion unit
Hide thumbs Also See for SPARC Enterprise T5120:
Table of Contents

Advertisement

4.3

Preparing the Cable Plate for Service

On the cable management unit, raise the cable plate (
provide easier removal of a PCI carrier or I/O boat.
1. Use an antistatic strap for this procedure.
2. Loosen two cable plate locking screws (item 3 in
3. Pull the cable plate toward you approximately 0.5 in./13 mm, then raise it
approximately 0.75 in./20 mm, until the bottom of the plate is above the tops of
the support brackets.
4. Push the cable plate forward to its service position (
plate rests on the support brackets.
The tabs on the sides of the cable plate should lie in the small notches on the tops
of the support brackets.
FIGURE 4-2
Type A Cable Plate
FIGURE 4-2
FIGURE 4-4
FIGURE 4-4
Chapter 4
Servicing and Replacing Components
) to
or
FIGURE 4-3
).
) so that the cable
4-5

Advertisement

Table of Contents
loading

Table of Contents