4.1
Service Procedures Task Map
Service Task Map
TABLE 4-1
FRU
Task
PCI card
• Install a new PCI card
• Replace an existing PCI card
PSU
• Replace a PSU
Cable
• Prepare the cable plate for I/O boat
Management
service
Carrier
• Replace a carrier
Link
• Replace a link cable
• Replace a link card
I/O boat
• Install a second I/O boat
• Replace an I/O boat
Replace the External I/O Expansion
Chassis
Unit chassis
4-2
External I/O Expansion Unit Installation and Service Manual for SPARC Enterprise T5xxx Servers • April 2011
Comments
Section 3.1, "Installing a PCI Card" on page 3-1
Section 3.2, "Replacing a PCI Card" on page 3-9
Section 4.2, "Replacing a Power Supply Unit" on page 4-3
Section 4.3, "Preparing the Cable Plate for Service" on
page 4-5
Section 4.4, "Replacing a Carrier" on page 4-7
Section 4.5, "Replacing a Link Cable" on page 4-10
•
Section 4.6, "Replacing a Link Card in the Host Server"
on page 4-10
•
Section 4.7, "Replacing a Link Card in an I/O Boat" on
page 4-11
Section 4.8, "Installing a Second I/O Boat" on page 4-13
•
Section 4.9.1, "Replacing a Boat in a Single Boat
Configuration" on page 4-16
•
Section 4.9.2, "Replacing a Boat in a Dual Boat
Configuration" on page 4-19
Section 4.10, "Replacing the External I/O Expansion Unit
Chassis" on page
4-21.