Concluding Steps; Removing 3.5-Inch Hdd Modules; Preliminary Steps - Fujitsu PRIMERGY TX2540 M1 Upgrade And Maintenance Manual

Server primergy tx2540 m1
Hide thumbs Also See for PRIMERGY TX2540 M1:
Table of Contents

Advertisement

7.3.4.4

Concluding steps

"Installing accessible drive and HDD bay covers" on page 69
Ê
"Performing a RAID array rebuild" on page 99
Ê
7.3.5

Removing 3.5-inch HDD modules

Customer Replaceable Unit
(CRU)
Tools: tool-less
7.3.5.1

Preliminary steps

Ê If the HDD / SSD module to be removed is combined into a RAID array,
please proceed as follows:
RAID level
RAID 0
RAID 1
RAID 5
TX2540 M1
Procedure
Only remove an HDD module combined in a RAID 0
array if defective.
V
CAUTION!
Removing an operational HDD module will
result in data loss!
Removing an HDD module from a RAID 1 or RAID 5
array will not result in data loss.
However, the removed drive needs to be replaced
immediately by an HDD module of the same or larger
capacity.
I
After replacing the HDD module, RAID rebuild
will be performed as a background process as
described in section
rebuild" on page
Upgrade and Maintenance Manual
Hard disk drives / solid state drives
Hardware: 5 minutes
"Performing a RAID array
99.
167

Advertisement

Table of Contents
loading

Table of Contents