Basic hardware procedures
4.5.2.2
Installing the top cover
Figure 19: Installing the top cover (rack server)
Ê Check if the locking lever on the top cover is open.
Ê Lower the top cover onto the chassis, recessed by 2 cm (1).
Ê Close the locking lever on the top cover (2). This will slide the top cover shut
engaging the locking mechanism (3).
64
Upgrade and Maintenance Manual
TX2540 M1