Figure 4‑4. Attaching the hood's gas springs to the inverter
9. Remove the lifting strap and the eyebolts from the installed air intake hood.
10. Close the air intake hood.
11. Using a slotted screw driver, engage all three latches, by rotating clockwise, to
secure the front edge of the air intake hoods. Align the two dimples on the latch
bezel to ensure a tight seal.
☞
Important
PRE-INSTALLATION INSPECTION
Before placing and installing the inverter, the inverter should be inspected to identify
possible external and internal shipping damage. If a problem is identified during any
of these inspection steps contact AE Solar Energy Technical Support.
Pre-Installation Inspection Tools
The following tools are needed to perform the pre-installation inspection of the
inverter:
• Large flat blade (common) screwdriver
• Access door entry key
• Hex wrench
570-1001791-05A
The first air intake hood must be securely latched and the eyebolts
removed before installing the second hood.
Advanced Energy® AE 500 Inverter
Gas spring
Ball
Installing
4‑5