Step 4: Power Module Compartment; Figure 4-7. Pull Test Of Cable Screw Terminal Connection; Figure 4-8. Screen Inspection - Advanced Energy AE 600 User Manual

Table of Contents

Advertisement

Advanced Energy
Figure 4‑7. Pull test of cable screw terminal connection
4. Inspect the screens at the bottom of the compartment for damage or debris.
Figure 4‑8. Screen inspection
If any loose wires are found during the inspections, and the correct location of
the connection is unknown, contact AE Solar Energy Technical Support.

Step 4: Power Module Compartment

• Check the integrity of the bus bars and their connections in the upper power
module compartment.
4‑8
DC bottom entry gland plate
4686
Installing
Cable screw terminals
570-1001791-05A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae 500

Table of Contents