Advanced Energy
b. Phase A, B, and C to the AC landings inside the inverter.
☞
Figure 4‑15. AC connections
Figure 4‑16. Bus bar connections
4‑20
Important
The inverter auto phases and will auto detect phase rotation.
Optional revenue meter
Installing
AC surge
Soft start contactor
Optional AC disconnect
AC landing
Ground
Bus bar
Crimp connector
Washer, 3/8 high strength
Screw, hex cap, 3/8 - 16 x 1, Grade 8
Washer, Belleville, 3/8, 6500 lb flat load
4618
Nut, hex, 3/8 - 16, Grade 8
570-1001791-05A