When Mscs Is Used - Hitachi XP P9500 User Manual

Hitachi dynamic link manager software user guide for windows (6.6) (hit5201-96006, november 2011)
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

24
Connect cables to all the HBAs to change the configuration to a multi-path
.
configuration.
Figure 3-4 Single Path Configuration and Multi-path Configuration on page
3-55
25
Check the path information as described in
.
Configuration on page 3-68
assembled a multi-path configuration.

When MSCS Is Used

The following provides explanations of how to install MSCS before and after
an HDLM installation.
Installing MSCS after an HDLM installation
To install HDLM and then MSCS:
1
Shut down all the hosts.
.
2
Make sure that all the hosts that make up the cluster system have been
.
fully shut down.
3
Restart each host.
.
Restart them all in the single path configuration.
4
Log on to Windows as a member of the Administrators group.
.
5
Save the license key file directly under the Windows installation-
.
destination drive. Also, instead of using the license key file, you can
directly specify a license key during the installation of HDLM.
installation-drive:\hdlm_license
The license key file will be deleted after the installation finishes.
6
Perform the installation.
.
shows a single path configuration and a multi-path configuration.
Figure 3-4 Single Path Configuration and Multi-path Configuration
Creating an HDLM Environment
Hitachi Dynamic Link Manager User Guide (for Windows(R))
Checking the Path
to make sure that you have successfully
3-55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynamic link manager

Table of Contents