Hitachi XP P9500 User Manual page 103

Hitachi dynamic link manager software user guide for windows (6.6) (hit5201-96006, november 2011)
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

Elog Level
Elog File Size (KB)
Number Of Elog Files
Trace Level
Trace File Size(KB)
Number Of Trace Files
Path Health Checking
Auto Failback
Remove LU
Intermittent Error Monitor
HDLM Manager Ver
Alive
x.x.x-xx
HDLM Alert Driver Ver
Alive
x.x.x-xx
HDLM Driver Ver
Alive
x.x.x-xx
License Type Expiration
Permanent
-
KAPL01001-I The HDLM command completed normally. Operation name
= view, completion time = yyyy/mm/dd hh:mm:ss
23
Use the results of the view operation to check the version of the installed
.
HDLM.
If x.x.x-xx is displayed in HDLM Version, the correct version of HDLM
has been installed.
24
Use the results of the view operation to check that the programs are
.
running properly.
If HDLM Manager, HDLM Alert Driver, and HDLM Driver are all Alive, all
the programs are running correctly.
25
After the installation finishes, check the path information as described in
.
Checking the Path Configuration on page
have successfully installed HDLM in a single-path configuration.
26
Connect cables to all the HBAs to change the configuration to a multi-path
.
configuration.
27
Check the path information as described in
.
Configuration on page 3-68
assembled a multi-path configuration.
28
Shut down the host.
.
29
For all the hosts that make up the cluster system, perform steps 19 to 27.
.
30
Restart each host.
.
31
Install MSCS.
.
32
Shut down each host after completing the installation of MSCS on it.
.
33
Restart each host.
.
34
Log on to Windows again as a member of the Administrators group.
.
35
Make sure that the program is working normally running properly, by
.
examining the results of the dlnkmgr command's view operation.
Make sure that on MSCS is displayed in Support Cluster. An example of
executing the dlnkmgr command's view operation is as follows:
Creating an HDLM Environment
Hitachi Dynamic Link Manager User Guide (for Windows(R))
: 3
: 9900
: 2
: 0
: 1000
: 4
: on(30)
: on(1)
: off
: off
WakeupTime
yyyy/mm/dd hh:mm:ss
WakeupTime
yyyy/mm/dd hh:mm:ss 128
WakeupTime
yyyy/mm/dd hh:mm:ss
3-68, and make sure that you
Checking the Path
to make sure that you have successfully
ElogMem Size
3-37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynamic link manager

Table of Contents