Installing The Modules - 3Com 3C780 - LinkBuilder FDDI Base Unit User Manual

Fddi workgroup hub
Table of Contents

Advertisement

4
Quick Start
2.
3.
4.
5.

Installing the Modules

NOTE: You must install the management module first. It can only be installed
in slot 0. It will not function in any other slot. Install the remaining modules in
adjacent slots (in numerically ascending order) so there are no empty slots
between modules.
When you install the management module for the first time, be sure that power
to the hub is off. There is no power switch on the hub. Power to the hub is
provided by connecting the power cord to the hub and to an ac outlet.
NOTE: The hub allows "power-on insertion," which means that you do not
have to unplug the power cord for module insertion or removal. After removing
or inserting a module, press the RESET button, which is recessed on the
management module, or enter the reset command on the command line. This
reinitializes the ring and causes the system to run its power-
Keep all packing and shipping materials.
If a module must be returned, ship it in its original shipping container (or
one providing equivalent protection), or the warranty will be voided.
One at a time, remove each module from its antistatic bag.
Check the modules for any visible signs of damage.
If you detect damage, immediately notify your network supplier and the
carrier that delivered the module.
Place the modules back in their antistatic bags until you are ready to
install them.
-tests (POST).
on self

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3C780 - LinkBuilder FDDI Base Unit and is the answer not in the manual?

Questions and answers

Table of Contents