Equipping the Hub
This section discusses the following hub equipment:
Basic Contents
The basic package includes the following items:
The LinkBuilder FDDI
file and a backup image for the flash EPROM.
One LinkBuilder Management Module, which is shipped separately, is required
for each hub.
A 3-volt lithium battery is shipped with the management module. The battery is
in a small bag inside the management module shipping container. For battery
functions and installation instructions, see the section "Installing the Battery"
later in this chapter.
Hub chassis
Management module
Lithium battery
Media port modules
Fiber port keys (optional)
Cascade connector (optional)
LinkBuilder FDDI Workgroup Hub (base unit)
LinkBuilder FDDI Workgroup Hub User Guide
LinkBuilder FDDI System Software diskette, version 1.0
Standard ac power cord
Two brackets and eight screws for rack mounting
Four rubber pads for tabletop placement
System
Software diskette
, version
Installing the Hub
2-5
1.0
contains a readme
,
Need help?
Do you have a question about the 3C780 - LinkBuilder FDDI Base Unit and is the answer not in the manual?
Questions and answers