Quick Start
Use this Quick Start procedure if:
Road Map to Hub Operations
The steps listed below summarize the procedures needed to make the 3Com
LinkBuilder
each step is discussed in this user guide.
1.
2.
3.
4.
5.
6.
You are experienced in installing and operating LinkBuilder FDDI hubs.
You have an FDDI segment running with other network devices attached
to it.
®
FDDI Workgroup Hub operational. The list also shows where
Unpacking the hub and modules
–
Quick Start
–
Chapter 2: "Unpacking the Hub"; "Installing Modules"
Installing the modules
–
Quick Start
–
Chapter 2: "Installing Modules"
Connecting a terminal
–
Chapter 2: "Accessing the Hub"
Determining legal port connections
–
Chapter 2: "Planning Connections"
–
Chapter 3: "Attachment Options"; "Port Connections"
Attaching the hub to the ring
–
Chapter 2: "Connecting to the Dual Ring"
Attaching other devices to the hub
–
Chapter 2: "Data Flow Specifications"
Quick Start
1
®