YASKAWA SGLFW User Manual page 277

Linear σ series servomotors
Hide thumbs Also See for SGLFW:
Table of Contents

Advertisement

9 Operation
9.2.2 Setup Procedure Using Linear Servomotors with Hall Sensors
(b) Checking the Concurrence between the Linear Scale Count Direction and the Linear Ser-
vomotor Forward Direction
Next, move the coil assembly by hand in the direction of the side with the cable, and check that the Un00D
monitor is counting up.
When the linear servomotor is moved by hand to the side with the cable,
if the value of Un00D is a countup value, confirmation is completed.
When the Value of the Un00D is counted down
INFO
When the value of the Un00D is a counted down, set the parameter Pn080.1 = 1 (B-phase progression, U, V, W-phase in
order). Enable the setting by setting validation.
With this setting, the SERVOPACK performs current control by treating the linear scale countup direction as the motor
forward direction.
(c) Related Parameters
Pn080.1 is available for software version 32 or later.
Parameter
Pn080
n.
n.
(6) Jog Operation from the Panel Operator
When turning ON the servo for the first time after installation and wiring, stand away from the motor mov-
IMPORTANT
ing part as overrun may occur.
1. To perform a trial operation with a load attached, set mass ratio (Pn103) before running.
When the calculated mass ratio exceeds 20000%, set 20000 in the parameter and adjust loop gains.
Pn103
Mass Ratio
Use the following formula to obtain the mass ratio.
Mass ratio (Pn103) =
* This setting range is applicable for software version 32 or later. The range for software earlier than ver-
sion 32 is 0% to 10,000%.
Perform trial operations without a load attached, where possible.
INFO
2. Turn ON the control power supply and main circuit power supply.
3. Operate the panel operator or digital operator and move the linear servomotor using jog operation. For
details on jog operation, refer to 8.2.3 JOG Mode Operation (Fn002).
4. Check that the linear servomotor moves normally from end to end of the stroke.
9-10
0
Phase-A progression, phase-U, V, W order (factory setting)
1
Phase-B progression, phase-U, V, W order
Setting Range
Setting Unit
0 to 20000 %
Load mass (including mass of coil assembly)
Coil assembly mass
Linear servomotor cable
attached to coil assembly
Description
Factory Setting
1 %
0 %
−1
× 100 [%]
Speed
Position
Force
Setting Validation
Immediately

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

SgltwSglgwΣ-ii seriesSgdh servopack

Table of Contents