FP PostBase Vision M2 Reference Manual page 17

Franking machine
Hide thumbs Also See for PostBase Vision M2:
Table of Contents

Advertisement

Power supply unit
Power cable
Ethernet cable
Connection
Computer Network / Router
Power connection
Installation and commissioning
Caution! If the PostBase Vision M2 was
previously in a cold environment (i.e. below
10 °C / 50 °F): Wait at least two hours after
unpacking before connecting the franking
machine. The PostBase Vision M2 needs
this time to adapt to the environmental
conditions.
For the wired connection to your local area
network (LAN):
• Connect the Ethernet cable to the franking
machine and the local network / router.
• Plug the DC plug of the power supply unit
into the 24 V DC input of the franking
machine.
• Plug the power cable into the power con-
nection of the power supply unit.
• Only then plug the power cable into the
power outlet.
17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PostBase Vision M2 and is the answer not in the manual?

Questions and answers

Table of Contents