Step 2: Assembling The Postbase Vision M2 - FP PostBase Vision M2 Reference Manual

Franking machine
Hide thumbs Also See for PostBase Vision M2:
Table of Contents

Advertisement

Step 2:
Assembling the PostBase Vision M2
Installation site
The installation site for the PostBase Vision M2
franking machine must meet the following
requirements:
– Firm, level, low vibration and horizontal
base, which offers sufficient space for the
franking machine. (The franking machine
dimensions can be found at page 127.)
– Room temperature in the range from
15 °C to 35 °C (59 °F to 95 °F).
– No direct sunlight.
– Relative humidity within a range of 15% to
80%, non-condensing.
– Power outlet in the immediate vicinity.
– Network connection with internet access.
• Place the PostBase Vision M2 franking
machine at its intended installation site.
• Remove the protective film from the
display.
Adjusting the display angle
• Grip the display's frame at the top and
bottom centre and pivot the display in
the desired position.
The adjustment mechanism is constructed in
such a way that the display safely arrests in
every position.
Installation and commissioning
15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PostBase Vision M2 and is the answer not in the manual?

Questions and answers

Table of Contents