2 - INSTALLATION OF UNIT

2.1 - General

To install an unit NXHP 4-14 the following steps are requested
1. Place the unit
2.  Make  hydraulic  connections  to  fill  the  system  with  water  or 
brine fluid
3. Make electrical connections
4.  Check for water leaks and the water flow rate control
5. Verify that al the panels are in place and tightly secured in
place. Make sure that the fan blade protection is installed and
locked in place
6.  Finally, make commissioning of the unit

2.2 - Moving and placing the unit

2.2.1 - Moving
See §1.2.1 Installation safety considerations.

Figure 1: Transport configuration

In the case of manual lifting of the unit, it is needed at least three 
(3) persons for the 004 - 010 units and four (4) persons for the 
012 - 014 units. In both situations, at least one person must lift 
the fan side and the others must lift the compressor side. This
configuration permits to limit the load per lifter to 40 kg.

Figure 2: Offloading configuration

CAUTION: The lifting sling must always slide through the feet.
20

Figure 3: Forklift position

2.2.2 - Placing the unit
In case of extra-high units the machine environment must
permit easy access for maintenance operations.
Always refer to § 1.4. Dimensions and clearances to confirm
that there is adequate space for all connections and service
operations. For the centre of gravity coordinates, the position
of the unit mounting holes, and the weight distribution points,
refer to the certified dimensional drawing supplied with the
unit.
Typical applications of these units do not require earthquake
resistance. Earthquake resistance has not been verified.
CAUTION:
Only use slings at the designated lifting points (refer to Figure
2 to offload the unit).
Before siting the unit check that:
■ The permitted loading at the site is adequate or that appropriate
strengthening measures have been taken.
■ If the unit has to operate as a heat pump in temperatures below 
0°C it must be raised at least 300 mm from the ground. This is 
necessary to avoid ice build-up on the unit chassis and also to
permit correct unit operation in locations where the snow level 
may reach this height.
■ The  unit  is  installed  level  on  an  even  surface  (maximum 
tolerance is 5 mm in both axes).
■ There  is  adequate  space  above  the  unit  for  air  flow  and  to 
ensure access to the components (see dimensional drawings).
■ The number of support points is adequate and that they are in
the right places.
■ It is mandatory to use 4 (four) bolts with sufficient strength in 
the 4 (four) foot holes
■ The location is not subject to flooding.
■ For  outdoor  installations,  where  heavy  snowfall  is  likely  and 
long periods of sub-zero temperatures are normal, provision 
has to be made to prevent snow accumulating by raising the 
unit  above  the  height  of  drifts  normally  experienced.  Baffles 
may be necessary to deflect strong winds. They must not restrict 
air flow into the unit.
■ OAT sensor, located on the coil, should not be exposed to the 
sun or other heat sources.
■ If the unit is installed must be install above the ground, always 
make  sure  to  use  adapted  wall  brackets  and  verify  that  the 
weight allowed is higher than the unit weight.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nxhp 004Nxhp 006Nxhp 008Nxhp 010Nxhp 012Nxhp 014

Table of Contents