Installation And Mounting; Preparation - Siemens SICHARGE D Dispenser Operating Instructions Manual

Table of Contents

Advertisement

Installation and mounting

5.1

Preparation

Tools list
Ensure that before beginning work all required tools, materials and lifting gear is available.
The following list does not claim to be complete:
• Personal protective equipment (PPE) (Page 11)
• Fall arrester (Page 11)
• Crane
• Drill hammer
• Drilling machine
• 12 mm drill bit for concrete
• 4 units M12 stud bolts with approx. 50 mm long thread
• 4 units nuts M12 DIN 934
• 4 units spring washers M12
• 4 units spring washers M12 DIN 125
• Shims for alignment
• Step drill
• Cable knife
• Press tool for cable lug M10
• Torque wrench up to 70 Nm
• Torque wrench up to 10 Nm
• Socket wrench set up to at least 19 mm width across flats
• Ring wrench set up to at least 19 mm width across flats
• Allen key 5 mm
• Torx screwdriver TX30
• Hammer
• Spirit level
• Stepladder
• Hot air gun
• Shrink-on sleeve for cable diameter used
• Cable lugs of size M8 with a maximum width of 32 mm for the used conductor cross-
section
As an example from the company Klauke:
– Mount 11SG8 for cables up to 185 mm
– Mount 12SG10 for cables up to 240 mm
– Mount 13SG10 for cables up to 300 mm
• Folding ruler
• Permanent marker
• Two-pole voltage tester
Dispenser
Operating Instructions, 10/2023, A5E52758387-AB
2
with M8 screw
2
with M8 screw and large washer
2
with M8 screw and large washer
5
37

Advertisement

Table of Contents
loading

Table of Contents