Platform Assembly - Skyjack SJ85 AJ Service Manual

Articulating boom
Hide thumbs Also See for SJ85 AJ:
Table of Contents

Advertisement

Section 1 – Scheduled Maintenance
2

1.6-7 Platform Assembly

Railings and gates
1
2
Make sure there are no loose or missing parts,
and there is no visible damage.
Make sure the fasteners are correctly installed.
Make sure the platform railings
correct position.
Make sure the gates or drop bars
good condition and operate correctly.
MEWP floor
3
Make sure the MEWP floor is solid and there is
no visible damage.
Footswitch
4
Make sure the footswitch is in good working
order and has not been tampered with,
disabled or blocked.
Fall-protection anchorages
5
Make sure that the fall-protection anchorages
are correctly installed.
Make sure there is no visible damage.
AC power socket
6
Make sure that the socket is free of dirt or
blockages.
229044ADA
26
7
5
are in the
1
are in
2
6
2
4
8
9
Platform control console
7
Make sure all switches and controllers are in
the neutral position.
Make sure there are no loose or missing parts,
and there is no visible damage.
Manual storage box
8
Make sure that the operation manual and
other important documents are in the manual
storage box.
Make sure that the documents are in good
condition, and you can read them.
Always put the manuals and other documents
back in the storage box after use.
Load Cell
(B)
9
Make sure there are no loose or missing parts,
and there is no visible damage.
Make sure the fasteners are correctly installed.
Make sure the cables are in good condition.
Make sure the cable connections are tight.
Make sure there is no debris lodged between
the platform and the boom adaptor.
Scheduled Maintenance Inspections
1
3
(B)
(B)
SJ85 AJ

Advertisement

Table of Contents
loading

Table of Contents