Visual and daily maintenance inspections
3

4.2-8 Platform assembly

Do the inspection that follows in sequence:
WARNING
Fall hazard. Use the three points of contact
principle when you enter or exit the platform. If
you do not obey, there is a risk of death or serious
injury.
1. Enter the platform
2. Close the gate or drop bar.
Platform railings
1
Make sure there are no loose or missing parts,
and there is no visible damage.
Make sure the fasteners are correctly installed.
Make sure the platform railings
correct position.
Make sure the gates or drop bars
good condition and operate correctly.
Fall-protection anchorages
3
Make sure that the fall-protection anchorages
are correctly installed.
Make sure there is no visible damage.
Footswitch
4
Make sure the footswitch is in good working
order and has not been tampered with,
disabled or blocked.
SJ63 AJ+
7
8
are in the
1
are in
2
Section 4 – Inspections Before Operation
6
1
5
4
2
MEWP floor
5
Make sure the MEWP floor is solid and there is
no visible damage.
AC power socket
6
Make sure that the socket is free of dirt or
blockages.
Platform control console
7
Make sure all switches and controllers are in
the neutral position.
Make sure there are no loose or missing parts,
and there is no visible damage.
Manual storage box
8
Make sure that the operation manual and
other important documents are in the manual
storage box.
Make sure that the documents are in good
condition, and you can read them.
Always put the manuals and other documents
back in the storage box after use.
3. Exit the platform.
3