Boom Assembly - Skyjack SJ85 AJ Service Manual

Articulating boom
Hide thumbs Also See for SJ85 AJ:
Table of Contents

Advertisement

Scheduled Maintenance Inspections
1
2

1.6-8 Boom Assembly

Rotary actuator
1
There are no loose or missing parts, and there
is no visible damage.
All fasteners are correctly tightened.
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
Jib
(B)
2
There are no loose or missing parts, and there
is no visible damage.
All fasteners are correctly tightened.
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
Boom
(B)
3
There are no loose or missing parts, and there
is no visible damage.
All fasteners are correctly tightened.
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
Make sure there are no visible cracks in
welds or structure and there are no signs of
deformation.
Cable Track
(B)
4
There are no loose or missing parts, and there
is no visible damage.
SJ85 AJ
5
4
6
8
3
7
Wear Pads
(B)
5
All fasteners are correctly tightened.
There are no loose or missing parts, and there
is no visible damage to the wear pads.
Riser
(B)
6
There are no loose or missing parts.
There is no visible damage.
All fasteners and pins are correctly tightened.
There are no visible cracks in welds
or structure and there are no signs of
deformation.
Cylinders
(B)
7
Make sure the cylinders are correctly installed.
Make sure there is no indication of leaks or
damage.
Make sure all pins and bushings are secure
and properly tightened.
Control Cables and Hoses
8
There are no loose or missing parts, and there
is no visible damage.
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
Section 1 – Scheduled Maintenance
5
(B)
229044ADA
27

Advertisement

Table of Contents
loading

Table of Contents