Platform Assembly - Skyjack SJ30 AJE Operating Manual

Articulating booms
Table of Contents

Advertisement

Visual & Daily Maintenance Inspections

4.2-8 Platform assembly

Ensure there are no loose or missing parts and
there is no visible damage.
Ensure all fasteners are securely in place.
Ensure fall protection anchorage(s)
secure and there is no visible damage.
Ensure all railings
and secured.
Ensure gate (if equipped)/drop bar
good working order.
Ensure footswitch
order and has not been modified, disabled or
blocked.
Ensure MEWP floor
no visible damage.
Ensure AC outlet has no visible damage and is
free from dirt or obstructions.
Platform control console
5
Ensure all switches/controllers are returned to
neutral.
Ensure there are no loose or missing parts and
there is no visible damage.
SJ30 AJE SJ30 ARJE
5
6
1
are
1
are properly positioned
2
is in
3
is in good working
4
is secure and there is
5
1
2
3
4
5
Manuals
6
Ensure a copy of operating manual, and other
important documents are enclosed in manual
storage box.
1. Check to be sure manual storage box is
present and in good condition.
2. Ensure manuals are legible and in good
condition.
3. Always return manuals to the manual storage
box after use.
Section 4 – Pre-operation
213213AAA
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj30 arje

Table of Contents