Skyjack SJ85 AJ Service Manual page 150

Articulating boom
Hide thumbs Also See for SJ85 AJ:
Table of Contents

Advertisement

Section 5 – Procedures
7. Loosen the strain relief connector, and pull the
disconnected harness out of the control box.
8. Pull all harnesses through the cable guard on
the swivel joint.
9. Mark and disconnect the platform rotary actuator
hydraulic hoses. Use a suitable container or rags
to catch any oil spillage. Cap hoses and ports to
keep them clean.
229044ADA
154
10. Remove the 8 bolts which secure the rotary
actuator to the platform base mount.
11. Remove the main pivot bolt.
M62021AA
12. Carefully move the platform assembly away from
the jib. Set it down on suitable blocking nearby
13. To reinstall the platform, follow the preceeding
steps in reverse order.
14. Torque the 8 smaller rotary actuator bolts in a
criss-cross pattern to 35 ft-lb (47 Nm). Refer to
5.4-3 Rotary Actuator Bolt Torque Procedure.
15. Torque the center rotary actuator bolt to 680 ft-lb
(922 Nm).
IMPORTANT
w are routed and secured in such a way so as to
avoid pinching or chafing as the platform moves.
CAUTION
To avoid personal injury or equipment damage,
perform all of the function tests given in your unit's
Operating Manual after reconnecting all of the
M62252AA
cables.
Platform
M62024AA
.
SJ85 AJ

Advertisement

Table of Contents
loading

Table of Contents