Page 2
We sell worldwide for the brands: Genie, Terex, JLG, MultiQuip, Mikasa, Essick, Whiteman, Mayco, Toro Stone, Diamond Products, Generac Magnum, Airman, Haulotte, Barreto, Power Blanket, Nifty Lift, Atlas Copco, Chicago Pneumatic, Allmand, Miller Curber, Skyjack, Lull, Skytrak, Tsurumi, Husquvarna Target, Stow, Wacker, Sakai, Mi-T-M, Sullair, Basic, Dynapac, MBW, Weber, Bartell, Bennar Newman, Haulotte, Ditch Runner, Menegotti, Morrison, Contec, Buddy, Crown, Edco, Wyco, Bomag, Laymor, EZ Trench, Bil-Jax, F.S.
Page 3
This manual is based on Serial Number(s): SJ30 AJE & SJ30 ARJE: A300 000 001 & Above Original instructions in English.
Page 4
Safety Blue indicates Safety IMPORTANT Information. IMPORTANT indicates a procedure essential for safe operation and which, if not followed, may Figure 01 Label legend result in a malfunction or damage to the MEWP . SJ30 AJE SJ30 ARJE 213213AAA...
3000 hours, whichever occurs first. Any defective chassis. part will be replaced or repaired by your local Skyjack dealer at no charge for parts or labor. In addition, 1.1-2 Purpose of equipment all products have a 5 year structural warranty.
3. ANSI/SAIA (United States) Operators are required by the current ▪ ANSI/SAIA A92.22:2018 standards to read and understand their responsibilities in this manual and the manual of responsibilities before they use or operate this MEWP . 213213AAA SJ30 AJE SJ30 ARJE...
15 cm (6 in) toe boards. The platform can be entered through a drop bar, located opposite the control box side. The platform can be rotated in either direction. An AC outlet is also located on the platform. SJ30 AJE SJ30 ARJE 213213AAA...
Page 12
Section 1 – About this Mobile Elevating Work Platform (MEWP) Major Assemblies Fly boom Platform Main boom Boom assembly Riser Turret Base/Chassis Wheels Figure 02 Major assemblies 213213AAA SJ30 AJE SJ30 ARJE...
WARNING Use original or manufacturer-approved parts and components for the MEWP . NOTE Refer to Skyjack’s website www.skyjack.com for the latest service bulletins prior to performing frequent/periodic or annual inspections. 1.4-3 Owner’s inspections It is the responsibility of the owner to arrange daily, quarterly (or 150 hours) and annual inspections of the MEWP .
IMPORTANT Any modifications from the original design are strictly forbidden without written permission from Skyjack. Always assume the electrical power sources and overhead lines are energized. 2.1 Electrocution Hazard MAINTAIN a minimum safe This MEWP is not electrically insulated.
DO NOT raise the MEWP or operate elevated in windy or gusty conditions that exceed the limits specified in Section 7.7. 213213AAA SJ30 AJE SJ30 ARJE...
Page 16
Refer to Section 4.2-5: Wheel/Tire Assembly. AVOID overhead obstructions. Be aware of overhead obstructions or other possible DO NOT alter or disable limit hazards around MEWP when switches or other safety devices. lifting or driving. SJ30 AJE SJ30 ARJE 213213AAA...
All personal fall protection equipment must be attached only to approved anchorage points within the platform of the MEWP . 213213AAA SJ30 AJE SJ30 ARJE...
Failure to avoid these hazards could result in death wind and weather conditions ▪ or serious injury. the presence of unauthorized personnel ▪ the presence of other mobile equipment ▪ traffic hazards ▪ other possible unsafe conditions ▪ SJ30 AJE SJ30 ARJE 213213AAA...
8) on the MEWP . Before operating this MEWP , perform the following tasks: 1. Visual and daily maintenance inspections (refer Section 4.2) 2. Function tests (refer to Section 4.3) 3. Jobsite inspection (refer to Section 2.4). SJ30 AJE SJ30 ARJE 213213AAA...
Main power connector - This connector, when disconnected and locked out, disconnects power to all circuits. Connector must be plugged in to base to operate any circuit. Disconnect and lock out when transporting MEWP . SJ30 AJE SJ30 ARJE 213213AAA...
MEWP , or activate platform control console. Jib rotation switch (if equipped) - This switch controls left or right rotation of jib. 213213AAA SJ30 AJE SJ30 ARJE...
Refer to Section 6.5 should be lowered and retracted immediately. for instructions on how to charge the batteries. Refer to Section 6.2 for instructions on how to recover from an inclined position. SJ30 AJE SJ30 ARJE 213213AAA...
Page 24
Jib rotation switch (if equipped) - This switch Secondary guarding electrical (SGE) reset controls left or right rotation of jib. button - This button, when depressed, shuts off the audible/visual alarm from the SGE. 213213AAA SJ30 AJE SJ30 ARJE...
Boom Extension, moving into elevated travel Enabled Enabled Boom Up, and Enabled Enabled position (at the limits of the lowered Riser Up disabled travel position) Elevated travel position Enabled Enabled Drive disabled Enabled Enabled 1254AC 213213AAA SJ30 AJE SJ30 ARJE...
Ensure platform is level and there are no ▪ obstructions contacting the platform. If the platform load sensing system remains in fault mode, the emergency power unit may be used to lower the platform. Contact a qualified/ competent person for repairs. SJ30 AJE SJ30 ARJE 213213AAA...
This outlet is a source of AC power on the platform. The outlet is located on the right side of platform control console and the plug is located at the middle rear section of the turret. Figure 12 Secondary guarding electrical (SGE) 213213AAA SJ30 AJE SJ30 ARJE...
MEWP in the event of the MEWP encountering a “drop-off” or “pothole.” WARNING Do not drive elevated in areas where electrical cords or debris are in the path of travel. SJ30 AJE SJ30 ARJE 213213AAA...
This works in conjunction with the all motion alarm. Figure 14 Work light NOTE Ensure base emergency stop button is pulled out and platform control console has been activated using base/off/platform key switch. 213213AAA SJ30 AJE SJ30 ARJE...
GFCI outlet - During inverter operation, this outlet provides AC power. 15 Amp circuit breaker - In the event of a power overload or circuit grounding, the circuit breaker pops out. Press the breaker back in to reset. SJ30 AJE SJ30 ARJE 213213AAA...
(if equipped) smart ID card to be operated. Access control is an added functionality of the Elevate Trackunit which can be used in Skyjack vertical masts, NOT USED scissor lifts, booms or telehandlers. The access control functionality DOES NOT affect...
Page 33
2. Press green checkmark to confirm. position. Result: Green light indicates authorized ID. ▪ Skyjack DOES NOT manage the time out settings Begin operation. of the access control unit. Contact machine owner if time out settings need to be modified.
Repairs to the MEWP may only be made by qualified/ competent repair personnel. After repairs are completed, the operator must perform visual and daily maintenance inspections, and function tests again. Scheduled maintenance inspections shall only be performed by a qualified/competent person. SJ30 AJE SJ30 ARJE 213213AAA...
▪ Refer to Section 8 in this manual and determine that all labels are in place and are legible. the underside of the base ▪ ground area under the MEWP ▪ 213213AAA SJ30 AJE SJ30 ARJE...
1. Check all tire treads and sidewalls for cuts, cracks, punctures and unusual wear. 2. Check each wheel for damage and cracked welds. SJ30 AJE SJ30 ARJE 213213AAA...
Page 37
1. Check battery case for damage. 2. Ensure all battery connections are tight. 3. If applicable, check battery fluid level. If plates are not covered by at least 13 mm (1/2”) of solution, add distilled or demineralized water. 213213AAA SJ30 AJE SJ30 ARJE...
▪ there is no visible damage. Main manifold Ensure all fittings and hoses are properly ▪ tightened and there is no evidence of hydraulic leakage. Ensure there are no loose wires or missing ▪ fasteners. SJ30 AJE SJ30 ARJE 213213AAA...
The hydraulic oil level should be between the ▪ minimum and maximum marks on the sight glass. Add oil as needed. Refer to service manual for recommended oil type. 213213AAA SJ30 AJE SJ30 ARJE...
Ensure AC outlet has no visible damage and is ▪ free from dirt or obstructions. Platform control console Ensure all switches/controllers are returned to ▪ neutral. Ensure there are no loose or missing parts and ▪ there is no visible damage. SJ30 AJE SJ30 ARJE 213213AAA...
▪ tightened. Ensure there are no visible cracks in welds ▪ or structure and there are no signs of deformation. Ensure all hoses are properly tightened and ▪ there is no evidence of hydraulic leakage. 213213AAA SJ30 AJE SJ30 ARJE...
Control box cover (if equipped) Ensure control box cover is properly secured ▪ with no signs of visible damage. Air line (if equipped) Ensure air line is properly secured with no ▪ signs of visible damage. SJ30 AJE SJ30 ARJE 213213AAA...
MEWP into service. Prior to performing function tests, be sure to read and understand Section 5.1: Start Operation. NOTE All motion alarm should sound while activating the footswitch. 213213AAA SJ30 AJE SJ30 ARJE...
Result: Emergency stop light should ▪ continuously illuminate. 3. Push in emergency stop button and attempt to raise or lower the platform. Result: Platform raising and lowering functions ▪ should not operate. 4. Pull out emergency stop button. SJ30 AJE SJ30 ARJE 213213AAA...
3. Turn base/off/platform key switch to base position. 4. Turn emergency power switch to on position and activate each boom function. Result: All selected functions should operate. ▪ NOTE The emergency power unit has two-minute duty cycle. 213213AAA SJ30 AJE SJ30 ARJE...
5. On base control console, turn off/platform/base key switch to base position. Attempt to raise or lower the platform. Result: Platform raising and lowering functions ▪ should operate. SJ30 AJE SJ30 ARJE 213213AAA...
5. Depress and hold footswitch. 6. Turn emergency power switch to on position and activate any function (except drive/steer) momentarily. Result: The function should operate and the ▪ platform audible/visual alarm and reset button light should turn off. 213213AAA SJ30 AJE SJ30 ARJE...
Page 48
The reset button should illuminate as soon as the sensor 18. Enter platform and close gate (if equipped). bar is pressed and turn off when the bar is released. SJ30 AJE SJ30 ARJE 213213AAA...
4.3-12 Testing steering when the drive/steer controller is pulled 1. Depress and hold footswitch. backward. 2. Press rocker switch on top of drive/steer controller to left and right. Result: Steer wheels should turn left and right. ▪ 213213AAA SJ30 AJE SJ30 ARJE...
3. Lower main boom to stowed position. 4. Extend fly boom approximately 10 cm (4 in) and then slowly move drive/steer controller to full drive position. Result: The maximum achievable drive speed ▪ should be significantly less than stowed drive speed. SJ30 AJE SJ30 ARJE 213213AAA...
2. On platform leveling override switch, select up 4.3-17 Testing horn position to tilt platform up or down position to tilt platform down. 1. Push horn pushbutton. Result: Platform should tilt up or down. ▪ Result: Horn should sound. ▪ 213213AAA SJ30 AJE SJ30 ARJE...
Testing horn Testing brakes Rotary actuator Jib (non-rotating/rotating) Testing manual platform leveling 1417AA E-chain Riser Cylinders Wear pads NOTE: Make a copy of this page or visit the Skyjack website at www.skyjack.com for a printable copy. SJ30 AJE SJ30 ARJE 213213AAA...
▪ by the manufacturer. has safety devices which have been altered or ▪ disabled. Failure to avoid these hazards could result in death or serious injury. SJ30 AJE SJ30 ARJE 213213AAA...
2. Push platform rotation switch to either left or pushing it to the right or left. right position. Release switch to stop. 2. Push riser up/down switch to either up or down position. Release switch to stop. 213213AAA SJ30 AJE SJ30 ARJE...
The emergency power unit has two-minute duty of the base. Your area of operation should be cycle. cordoned from other personnel or equipment. CAUTION Do not use emergency power unit continuously for more than two minutes. SJ30 AJE SJ30 ARJE 213213AAA...
1. Depress and hold footswitch. 2. Push and hold boom/turret controller to raise or NOTE lower main boom. Driving and steering may be active at the same 3. Release controller handle to stop. time. 213213AAA SJ30 AJE SJ30 ARJE...
Refer to Section 6.1 for the emergency lowering procedure. NOTE The emergency power unit has two-minute duty cycle. CAUTION Do not use emergency power unit continuously for more than two minutes. SJ30 AJE SJ30 ARJE 213213AAA...
Do not attempt to free a snagged platform ▪ with lower controls until personnel are removed from the platform. NOTE The emergency power unit has two-minute duty cycle. CAUTION Do not use emergency power unit continuously for more than two minutes. SJ30 AJE SJ30 ARJE 213213AAA...
Figure 21 Disengage cap - outward position 1. Before winching or towing MEWP , fully retract, lower and position boom over rear drive wheels in line with direction of travel. SJ30 AJE SJ30 ARJE 213213AAA...
23). c. Insert disengage cap and fasten bolts, using a 11mm (7/16”) wrench. Brake is now released. NOTE Ensure o-ring remains seated. Figure 22 Disengage cap Inward position Figure 23 Disengage cap - inward position 213213AAA SJ30 AJE SJ30 ARJE...
For loading and unloading using a winch line, refer to Section 6.3. 6.4-1 Loading and tie-down 1. Turn key switch to off position and remove key before transporting. Figure 24 Tie-down points Figure 25 Platform tie-down SJ30 AJE SJ30 ARJE 213213AAA...
When lifting the MEWP , lifting devices must be attached to designated lift points only (refer to Figure 26). = 88.9mm (3.5") (1035.05mm) (1035.05mm) 40.750 " 40.750 " Figure 26 Lifting points/center of gravity NOTE: Center of gravity varies with different options. 213213AAA SJ30 AJE SJ30 ARJE...
AC input voltage range. CAUTION When changing the input voltage wait until all the LEDs are OFF or wait a minimum of 20 seconds before switching on the new voltage. SJ30 AJE SJ30 ARJE 213213AAA...
3 LEDs are “ON”. The charger will continue to charge at a low current then shut off automatically when complete. If all 3 LEDs blink together, there is a problem. 213213AAA SJ30 AJE SJ30 ARJE...
Page 68
0.38 m [1.8 in] [4 in] [1.6 in] [1 ft 3 in] 1.65 m [5 ft 5 in] 3.99 m [13 ft 1 in] 5.54 m [18 ft 2 in] Figure 30 Dimensions - SJ30 AJE SJ30 AJE SJ30 ARJE 213213AAA...
Page 69
0.30 m 0.04 m [1.8 in] [4 in] [1 ft] [1.6 in] 1.65 m 3.78 m [5 ft 5 in] [12 ft 5 in] 5.51 m [18 ft 1 in] Figure 31 Dimensions - SJ30 ARJE 213213AAA SJ30 AJE SJ30 ARJE...
Page 70
3.20 m/ 3.32 m [126 in - 131 in] 76° 180° 1.55 m/ 1.65 m [61 in - 65 in] Figure 32 Dimensions - SJ30 AJE 6.27 m [20 ft 7 in] 5.11 m 5.11 m 0.76 m [16 ft 9 in]...
Figure 34 This decal is located on the scissor assembly. It must be completed after an annual inspection has been completed. Do not use the MEWP if an inspection has not been recorded in the last 13 months. SJ30 AJE SJ30 ARJE 213213AAA...
The structure of the operating surface (beams, etc.) must be able to withstand more than the indicated values above. NOTE The LCP or OUP that an individual surface can withstand varies from structure to structure and is generally determined by the engineer or architect for that particular structure. 213213AAA SJ30 AJE SJ30 ARJE...
Do not mix different types of tires. Tires other than those specified can adversely affect stability. Failure to operate with matched, approved tires in good condition may result in death or serious injury. Replace tires with the exact, Skyjack-approved types only. SJ30 AJE SJ30 ARJE 213213AAA...
Section 8 – Labels SJ30 AJE & SJ30 ARJE Labels 8.1 SJ30 AJE & SJ30 ARJE Labels 8.1-1 Control side Description Label Pictorial Model number* Product Identifier *Model number will vary, may not be as shown. Body crushing hazard Warning - Body crushing hazard...
Page 79
SJ30 AJE & SJ30 ARJE Labels Section 8 – Labels Control side (continued) Description Label Pictorial Skyjack logo Skyjack Warning - Annual inspection Refer to operating manual. Ensure Annual and Daily Inspections are performed. Annual inspection Ensure that MEWP has received annual inspection prior to operation.
Page 80
Section 8 – Labels SJ30 AJE & SJ30 ARJE Labels Control side (continued) Description Label Pictorial Winching & towing procedure Refer to operating manual. 1. Block or chock wheels to prevent MEWP from rolling. 2. On either the left or right side of the MEWP , disconnect and lock out main power connector.
Page 81
SJ30 AJE & SJ30 ARJE Labels Section 8 – Labels Control side (continued) Description Label Pictorial Base control console Push and hold function enable switch to enable base control functions. Push ground circuit breaker to reset. Push power circuit breaker to reset.
Page 82
Section 8 – Labels SJ30 AJE & SJ30 ARJE Labels Control side (continued) Description Label Pictorial Serial plate* Product identification and specifications *Serial plates will vary, may not be as shown. Emergency lowering procedure Refer to operating manual. ...
Page 83
SJ30 AJE & SJ30 ARJE Labels Section 8 – Labels Control side (continued) Description Label Pictorial Elevate - Powered by Trackunit (if equipped) This MEWP is equipped with additional functionality. Caution tape stripe Warning - Maintenance support Do not enter the space beneath the work platform or extending structure during maintenance unless a means of structure support is in place.
Page 84
Section 8 – Labels SJ30 AJE & SJ30 ARJE Labels Control compartment Description Label Pictorial Grease points maintenance Refer to service and maintenance manual for lubricating MEWP . Warning - Do not alter Do not alter or disable limit switches or other safety devices.
Page 86
Section 8 – Labels SJ30 AJE & SJ30 ARJE Labels Front side (continued) Description Label Pictorial Main power connector Disconnect and lock out to disconnect power to all circuits. Plug in to base to operate any circuit. Connect AC supply Connect AC supply here.
Section 8 – Labels SJ30 AJE & SJ30 ARJE Labels 8.1-4 Platform views Description Label Pictorial Hazard identification Refer to Section 2: Operator Safety. Read and understand outlined risks associated with this MEWP prior to operation. Fall protection anchorage Attach personal Fall protection lanyard of each occupant to fall protection anchorage point.
Page 89
SJ30 AJE & SJ30 ARJE Labels Section 8 – Labels Platform views (continued) Description Label Pictorial No jewelry Caution - Do not wear jewelry. Operator’s daily inspection Refer to the operating manual. Perform visual inspection and function tests at the beginning of each shift. Refer to Section 4.4: Operator’s Checklist.
Page 90
Section 8 – Labels SJ30 AJE & SJ30 ARJE Labels Platform views (continued) Description Label Pictorial Connect AC supply Connect AC supply here. Manual box Indicates location of operating manual. Body crushing hazard Warning - Body crushing hazard. Model number* Product Identifier *Model number will vary, may not be as shown.
Page 91
SJ30 AJE & SJ30 ARJE Labels Section 8 – Labels Platform - top view Description Label Pictorial Warning - Do not alter Do not alter or disable limit switches or other safety devices. Footswitch enable (on/off) Depress and hold footswitch to enable platform function.
Page 92
Section 8 – Labels SJ30 AJE & SJ30 ARJE Labels Platform control console Description Label Pictorial Work light (if equipped)/Emergency power unit/SGE reset Select work light switch to enable work light (if equipped). Select emergency power switch to enable emergency power unit.
Page 93
SJ30 AJE & SJ30 ARJE Labels Section 8 – Labels Platform control console (continued) Description Label Pictorial Boom speed adjuster dial/Platform/Boom/Jib controls Adjust dial to vary speed of fly boom extension/retraction, jib raising/lowering and platform rotation movements. Select platform rotation switch to rotate platform to the left or right.
Section 8 – Labels SJ30 AJE & SJ30 ARJE Labels 8.1-5 Motor/Hydraulic side Description Label Pictorial Model number* Product Identifier *Model number will vary, may not be as shown. Body crushing hazard Warning - Body crushing hazard Crushing hazard Warning - Crushing hazard Warning - Do not alter Do not alter or disable limit switches or other safety devices.
Page 95
SJ30 AJE & SJ30 ARJE Labels Section 8 – Labels Motor/Hydraulic side (continued) Description Label Pictorial Skyjack logo Skyjack Lift and tie down points Only use these points for lifting or tying down. Wheel load* Indicates rated wheel load. *Wheel load will vary over different MEWPs.
Page 96
Section 8 – Labels SJ30 AJE & SJ30 ARJE Labels Motor/Hydraulic side (continued) Description Label Pictorial Winching & towing procedure Refer to operating manual. 1. Block or chock wheels to prevent MEWP from rolling. 2. On either the left or right side of the MEWP , disconnect and lock out main power connector.
Page 97
SJ30 AJE & SJ30 ARJE Labels Section 8 – Labels Motor/Hydraulic side (continued) Description Label Pictorial Warning - Maintenance support Do not enter the space beneath the work platform or extending structure during maintenance unless a means of structure support is in place. Refer to service manual for instructions regarding machine power isolation and structure support during maintenance.
A unique boom feature only utilized by Skyjack - the Boom Lift drive function operates in accordance with the general orientation of the turret’s counterweight over the chassis (i.e.
Page 101
WARNING Cancer and Reproductive Harm- https://www.p65warnings.ca.gov/.
Page 102
We sell worldwide for the brands: Genie, Terex, JLG, MultiQuip, Mikasa, Essick, Whiteman, Mayco, Toro Stone, Diamond Products, Generac Magnum, Airman, Haulotte, Barreto, Power Blanket, Nifty Lift, Atlas Copco, Chicago Pneumatic, Allmand, Miller Curber, Skyjack, Lull, Skytrak, Tsurumi, Husquvarna Target, Stow, Wacker, Sakai, Mi-T-M, Sullair, Basic, Dynapac, MBW, Weber, Bartell, Bennar Newman, Haulotte, Ditch Runner, Menegotti, Morrison, Contec, Buddy, Crown, Edco, Wyco, Bomag, Laymor, EZ Trench, Bil-Jax, F.S.