Required Tools And Materials; Continuing Backups - Spectra Logic T-Series Spectra T200 User Manual

Assisted self-maintenance guide
Hide thumbs Also See for T-Series Spectra T200:
Table of Contents

Advertisement

Chapter 6 – Replacing a QIP or Bus Expansion Module

Required Tools and Materials

You must have the following to complete this procedure:
A #2 Phillips screwdriver
A replacement QIP or bus expansion module:
G3 Fibre Channel QIP, encryption capable (F-QIP)
G5 Fibre Channel QIP, encryption capable (F-QIP)
G3 Gigabit Ethernet QIP (E-QIP)
Bus expansion module
Note:
After removing the new QIP or bus expansion module from its
packaging, be sure to keep the packaging for use when returning
the malfunctioning device to Spectra Logic.

Continuing Backups

QIPs
Backups running to drives associated with other QIPs in the library (or partition)
can safely continue during the replacement of the malfunctioning QIP. The only
exception is if the QIP being replaced is an exporting QIP (that is, the QIP provides the
robotic control path for the partition). Removing an exporting QIP removes the control
path to the transporter. If there is only one QIP assigned to a partition, that QIP is the
exporting QIP. Any backup operations that require using the transporter to move
media will fail while the exporting QIP is being replaced.
Note:
If you are replacing the exporting QIP, use your backup software
to stop any backups running to drives that are associated with QIP.
52

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the T-Series Spectra T200 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

T380

Table of Contents