Open Compensation Key Sequence; Connecting Dut - Agilent Technologies 4286A User Manual

Rf lcr meter
Table of Contents

Advertisement

1. 1
Push the arm lifter. 2
button. 3
Release the arm lifter while pushing the
arm latch button so that the pressure arm is held.

OPEN Compensation Key Sequence

1. Press
NNNNNNNNNNNNNN
OPEN .
2. After the open compensation sequence is completed, the
3. Press
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
DONE: COMPEN .
4. Verify that two CMP notations appear on the left side of the display.

Connecting DUT

1. 1
Loosen the locking knob. 2
positioner until the nose of the pressure arm is
located outside the frame.
C-8
Fixture Compensation Procedures for the 16191A and 16193A
Push the arm latch
Rotate the
2. Remove the shorting device.
NNNNNNNNNNNNNN
OPEN softkey label is underlined.
2. Place the DUT on the electrode.

Advertisement

Table of Contents
loading

Table of Contents